At their meeting of 21st February 2017, Sunderland’s Development Control (Sunderland South) Sub-Committee voted by a significant majority in favour of our client’s development of a part brownfield site within the urban area for a residential development comprising affordable housing, low cost housing and supported housing for people with learning difficulties.

At face value, you may have thought the application would sail through: a development of social housing on a brownfield site within the urban area, a residential area at that, and the brownfield part of the site was Council owned and was to be sold to our clients subject to planning permission being granted. How wrong you would have been.

The application, was recommended for approval at the meeting of 3rd January. However, the application faced stiff opposition from local residents and a Ward Councillor who attended the meeting and spoke against the application. At this point it was looking likely that the application would be refused. Thankfully, our Director, Rod Hepplewhite, also attended the meeting to speak in support of the application and was able to address the issues raised by the objectors. The Committee then decided to defer a decision to allow for the issues raised to be fully explored before the application was reported back to them.

Revisions were subsequently made to the proposals and additional information was provided, which addressed all of the issues that had been raised. When the application was reported back to Committee, again with a recommendation for approval, the objectors spoke again as did our Director, Rod Hepplewhite. He was able to advise that all issues previously raised had now been addressed, as evidenced by the officer report and the recommendation that that the proposed development be approved. In this instance the Planning Committee accepted our argument and by a significant majority voted in favour of granting planning permission. Our clients and the architect for the scheme http://www.bsbaarchitects.com who also attended the meeting were delighted with the outcome.

We have dealt with many applications for residential development of various forms. We have built up a good level of expertise on the subject and recognise that no two developments are the same and have learnt to be prepared for the unexpected. Notably, just because and application is recommended for approval doesn’t necessarily mean that the Planning Committee will grant planning permission. You should be represented at the Planning Committee meeting as we are aware of cases where only objectors speak and in the absence of the applicant being represented Planning Committee refuses planning permission. A subsequent planning appeal may succeed but that adds additional expense to the project as well as a significant time delay, both of which could have been avoided.
An exciting leisure-based regeneration project that will benefit Middlesbrough and the wider Tees Valley has taken its first step through the submission of a planning application to Middlesbrough Council. Prism Planning has submitted a planning application on behalf of Cool Runnings (NE) Ltd for the development of 2.87 hectares of land at Middlehaven Dock to provide a snow and leisure centre. Although the application is submitted is outline, seeking only the Council’s agreement to the development in principle at this stage, the application submission includes indicative and illustrative plans and drawings showing what the development is expected to look like. The key elements of the proposed development will comprise two ski slopes, a nursery slope for beginners and tuition and a main slope for more accomplished skiers. A range of complimentary leisure uses are also proposed including an ice-climbing wall, a ‘skydive’ arena, climbing wall, soft play area and trampolines together with café and restaurant facilities and related of retail facilities. The size and shape of the building is such that it can only sit along the northern edge of the dock. The presence of the listed clock tower to the north-west corner led to the decision that the low point of the building should be at the west end of the site. The high point of the building (corresponding to the top of the ski slope) is at the east end of the site, such that the building will appear to rise to meet the scale of the adjacent Temenos art installation. The sloping form generates a dynamic space which will allow the creation of a variety of dynamic single and double height interior spaces with natural light into and views out of the building. Prism Planning acted as planning consultant and project manager in the preparation and submission of the planning application, working hand-in-hand with our clients to ensure that all other consultants who assisted in the preparation of the planning application met client requirements and timescales. We liaised with officers of Middlesbrough Council during the preparation of the planning application and their constructive advice was much appreciated. It is hoped that the application will be approved within the 3-month target time frame, i.e. by mid-October.