News & Blog

Snow and Leisure Centre proposed for Middlehaven, Middlesbrough

An exciting leisure-based regeneration project that will benefit Middlesbrough and the wider Tees Valley has taken its first step through the submission of a planning application to Middlesbrough Council. Prism Planning has submitted a planning application on behalf of Cool Runnings (NE) Ltd for the development of 2.87 hectares of land at Middlehaven Dock to provide a snow and leisure centre. Although the application is submitted is outline, seeking only the Council’s agreement to the development in principle at this stage, the application submission includes indicative and illustrative plans and drawings showing what the development is expected to look like. The key elements of the proposed development will comprise two ski slopes, a nursery slope for beginners and tuition and a main slope for more accomplished skiers. A range of complimentary leisure uses are also proposed including an ice-climbing wall, a ‘skydive’ arena, climbing wall, soft play area and trampolines together with café and restaurant facilities and related of retail facilities. The size and shape of the building is such that it can only sit along the northern edge of the dock. The presence of the listed clock tower to the north-west corner led to the decision that the low point of the building should be at the west end of the site. The high point of the building (corresponding to the top of the ski slope) is at the east end of the site, such that the building will appear to rise to meet the scale of the adjacent Temenos art installation. The sloping form generates a dynamic space which will allow the creation of a variety of dynamic single and double height interior spaces with natural light into and views out of the building. Prism Planning acted as planning consultant and project manager in the preparation and submission of the planning application, working hand-in-hand with our clients to ensure that all other consultants who assisted in the preparation of the planning application met client requirements and timescales. We liaised with officers of Middlesbrough Council during the preparation of the planning application and their constructive advice was much appreciated. It is hoped that the application will be approved within the 3-month target time frame, i.e. by mid-October.